The Hiper II V1 Heating only heat interface has a single plate heat exchanger that produces only heating by radiators or by underfloor heating. Using the same design and components as the well-established twin plate version only without the hot water production output. This HIU would be used in commercial applications where only room heating is required, or some domestic applications where electric water heating is installed. The large surface area heat exchanger can give a wide range of outputs depending on the heat and flow available from the heat network supplying these HIUs. The unit could also provide heat output for a small indirect hot water storage cylinder. This cylinder would be fitted with motorised valves and thermostats for control and safety. Features
  • Auto Fault Diagnostics.
  • Modbus communications to report system conditions or fault conditions to a central monitor or BMS.
  • Pay As You Go (Prepayment) switching.
  • Integral shut off for Pay As You Go (PAYG) – no external Valve required!
  • Automatic closing of the Control valve when power lost.
  • Lockable settings
  • Test ports
  • Pump protection against Pump sticking.
  • Heating Radiators or Under Floor (UFH) selection.
  • Optimised or Constant temperature Heating option
  • Viewing access to Heat Meter calculator by lift up panel.
  • Frost protection function.
  • PWM pump speed control.
  • Pressure Differential and Flow Control by fast acting PICV with Stepper Actuator.
  • Dedicated strainers on all flow paths for component protection
Underfloor Heating On first start up of the HIU, UFH is the factory set default. This design feature eliminates accidental programming high temperatures into floor heating circuits. For drying or introducing a gradual introduction of heat to newly laid screed in UFH installations there is a European standard EN1264-4 part 4.4.1. This drying operation is different for different screeds.
  • Cement screeds after 21 days have elapsed.
  • Calcium Sulphate screeds after 7 days have elapsed.
  • Gush asphalt screeds after 1 day has elapsed.
Note that for all screed materials the manufacturer’s specifications should be followed. The Slab drying function can be initiated during first power up (step 4a) of the controller or by setting on in parameter 94, change parameter setting from OFF to ON. When it is activated is will deliver a flow temperature limited to 25C for 3 days, before raising the temperature to the UFH set temperature for 4 days before finishing and returning to standby mode. While in ‘slab drying’ mode the screen will show hours and minutes in operation and temperature of the flow to the floors.

RELATED PRODUCTS

Get support and advice from our team

Find answers to your most asked questions or contact our technical support team.

Find out how you can contact us by phone, email or visit us.

HIU Technical Support

During Weekends and Holidays

Should you require technical support for the Hiper HIU unit during this period, please contact one of our service providers in your area, who will be happy to help.

Please note, you will be required to provide the following information:

  • Code
  • Serial number
  • Installation date
  • Proof of purchase or warranty registration
  • Fault / Fault Code
  • System conditions
Thermalcare Scotland Ltd

Cover: Scotland

Phone: 0141 4141411

Email: scotland@thermalcare.co.uk

Please call the office number and this will put you thought to out of hours.

Cover: London Areas

Phone: +44 (0) 207 247 9304

Email: info@sandhurstplumbing.co.uk

Address: 18 Blount Street, London, E14 7BZ

Cover: England

Address: Building Centre, 26 Store Street, London, WC1E 7BT

Phone: 077 0449 7243

Email: aruna@heatweb.co.uk

Cover: Midlands, North & North Wales

Address: Unit 3 Chemical Lane Longbridge Hayes Ind Estate, Stoke-on-Trent , ST6 4BP

Phone: 01782 630656

Email: ange.holland@HMM.co.uk

Cover: London Areas

Phone: 07725920241

Email: aaron@hiumechservices.com

Address: 53A lansdowne lane , London, SE7 8TN